MGSoA’s classroom solution

COMING 2027

Community Building for the Arts

Introducing year-round art space to benefit students alongside the greater community of Mt. Gretna, in accordance with MGSoA’s mission:

❋ Meeting area for workshops and small gatherings

A multi-purpose art & community room

A quiet corner of the building full of art books and places to read

❋ Art book library and reading room

This artist’s cathedral will serve art makers with almost 1700 sq. ft. of open lofty space for artists to spread out and make artwork standing at easels and worktables.

❋ Open classroom full of natural light
❋ Natural outdoor setting by which artists and visitors may be inspired

A visual and contemplative source of learning where nature, art and community mutually support each other.

For locals, it’s very close to the size of the fire hall.

A secure and lasting classroom solution which expands on the rich resources that MGSoA already shares with the community.


2012

School established to provide transformative opportunities for artists as they grow from students to emerging professionals


2014

Concept proven as MGSoA becomes the preeminent destination for students both nationally and internationally


Challenges mount in finding rental housing for students and faculty. Four Artist Cottages are purchased and renovated to house students plus faculty.

2015: 202 Markwood Ave

2017: 200 Markwood Ave

2018: 411 5th Street

2020: 300 Birch Ave

2015-2020


Long part of our strategic plan, the goal of our own artist space shifts into focus. Suitable land was identified.

2024


Classroom space that was rented is no longer available. Plans to establish permanent space were accelerated.

2025


Why This Space is Needed:

  • The demand for MGSoA programs is growing

  • A stable classroom solution is critical. Local rental options are inadequate or unavailable for full-time and year-round use.

  • Guarantee accessibility and specialized artist functions of the facility.

  • Provide MGSoA artists and their Mt. Gretna neighbors with year-round artist space and cultural resources.


The new location is within easy walking distance of our cottages, same as our previous classroom rental, which is no longer available.

Our new driveway will follow the former path of Black Lane, currently used as a utility access driveway.

Potential Timing of the Building

Winter 2027

Complete purchase of the land.


We’re on track but ran into an unexpected a 3-6 month delay. This timeline was updated Nov 10th to reflect the delay.

Winter 2027

Construction of driveway and stream crossing to the build site.


Spring 2027

Begin Community Building construction.


Building completed, ready for furnishings and use.

Fall 2027


Further development of surrounding grounds.

Ongoing 2027

What do you want to see in a new classroom?

  • "The only thing I feel that is needed is a larger space."

    Former Student

  • "More space for students. Cubbies were always overflowing and fitting all students and easels into the classroom for drawing class was always a challenge."

    Former Student

  • "...AC would be nice. Better Lighting!"

    Former Student

Initial Project Budget*

$50,000 = Permitting and planning

$300,000 = Purchase 3-acre building site

$300,000 = Driveway, Stream-crossing, parking and sidewalks

$650,000 = Construction of building, contingencies

$200,000 = Solar panels purchase and installation

——————-

$1,500,000 = Total Estimated Budget

*an unexpected 3-6 mo delay is expected to coincide with an estimated $300,000 increase in our overall planning and construction costs. Fortunately we’ve reached $1,368,000 in pledges as of Nov 10th and will be able to make use of the additional time to raise the additional funds.